The ARC comes with 3 holes in the bellcrank for the pushrod to the flaps. Mine has the pushrod in the hole closest to the pivot which is about 7/16th from pivot is this correct?...Thanks
Greg L. Bahrman
Stuka Stunt Main Forum · 8 of 8 known posts recovered
Greg L. Bahrman
Greg,
Ya know, we sometimes are treated to a visit from the guy who claims to have done such a sterling and complete job of massaging these ARFs and ARCs for Brodak prior to giving approval for production.
That's funny, we don't seem to see him around when a series of questions like yours are brought up.
Your setup sounds a little slow, but then I don't know the dimensions of flap horn.
If I don't know what is needed on a new model, and the plans are not clear or appear confused, I will mock-up the controls. Sometimes I will even temporarily attach a CL handle to the leadouts just prior to nailing the control system in. Looks a little stupid "flying" the model from near wing tip, but it also gives ratios which are generally pretty close.
In any case, it is good to refer to a similar model you own and which has control ratios you like, replicating them in a new model.
If really worried about it, I think the hatches used on Top Flite's ARF Flite Streaks to be a pretty good idea.
Dan
"sacrifices must be made" Otto Lillienthal
Regards,
Phil
Phil D
I left the flap pushrod in the inner hole (after cutting open the sheeting to take a look see at everything). My flap pushrod goes to the outer hole in the flap horn and the elevator pushrod goes from the middle hole to the middle hole on the elevator. I'm seeing 1 to 1 control with a total of 30 - 40 degrees.
I suspect that will be okay, but if that's not enough, I'll move everything in one hole and try again. Real scientific.
I use and recommend the TLAR System when possible.

EDIT: Also, to ease your fears from another thread: I know the crimped, unbushed leadouts are not as elegant as I would have done had I built them from scratch. But I have seen other unbushed leadouts work on nylon bellcranks for years with no problems. You will probably wear out the piston and liner before you wear through the bellcrank.
Enjoy,
Ron King
"What lies behind us and what lies before us are tiny matters compared to what lies within us."
--- R.W. Emerson
I repeatedly brought the prototype to the field and left it out for anyone and everyone to fly - it was flown by everyone from beginners to top level experts. There were days when it flew continuously for three or four hours. Most of the flights were with the LA .46, on 63 foot lines, Hot-Rock handle. We also flew it with an ENYA .45, a Brodak .40, an OS .40 4S, and a Magnum .40.
I did the same at the Brodak Fly-in - offered it to anyone wanting to enter it and many took me up on it - It did quite well.
The most prevalent suggestion was to add more tail weight.
Hope this helps.
Bob Z.
ps - how about some others sharing experiences and suggestions.
On the Oriental ARC the Z-bend should into the middle hole in the bellcrank to the top hole of the flap horn. The Elevator push rod should from the middle hole on the flap horn to the middle hole on the elevator horn. I bushed my control horns to remove the lost motion.
Michael Schmitt