OK, mine is ready, nay, raring to go! There is this wet stuff outside that some East Coast person must have brought with him that looks to prevent first flights. AAAUUUGH

The only critiques so far, are that you need some sort of thin, remote grabber to put in the screws on the tail and engine and the fuel hose installation is a bit of a pain if you don't remove the engine first.
I used cable leadouts. My installation used teflon CA dispensing tubing over the wire where it went through the bellcrank, and 1/16" dia. aluminum tube crimped over the wire.
The old Chipmunk spinner is too big, the one from the P-39 would be perfect, if you have one (I don't - GASP!). The stock vinyl nub spinner will do just fine.
I used the second hole in the control horn as recommended, but since I plan to fly on 40' of .008 cable (if I can) the first hole may be the right one. Time will tell, and screw together construction allows easy changes.
Weight was 10 ounces on my scale, 1/2 ounce over what Mikey had quoted, but who'se counting? Besides, the scale I used isn't that accurate. Anyway, that is at least 1/2 ounce under the last incarnation of the Super Stunter, and should be fully competitive in beginner stunt.
Modified with a Norvel engine, and 50' lines, I'll bet you could compete in intermediate.
I put it together all by myself, does that comply with the BOM requirements? Nobody helped me.....