[photo not recovered: 28215.jpg]
I've finally gotten into taking the Hornet apart to begin the rebuild/finishing of the airplane. So far, I've tried to limit the size of the holes cut into the wing structure but everywhere I turn there are more and bigger holes required.
The 3" double Top Flite bellcrank is out and a new laser cut BBQB mount is being made by Kyle to mount the Morris phenolic 4" replacement. Trial fits have been made to determine sizes and clearances.
[photo not recovered: 28216.jpg]
The retract mechanism is all out. I didn't think this would be possible, but it worked out. This photo shows most of the stuff mounted inside the wings and nacelles, not counting the retract control components. All of this is scrap. There will have to be new shock gears made with altogether new mounts. Leaving the gear extended changes the design vertical Center of Gravity so the leadouts will also have to be relocated to the bottom of the wing tips. Everywhere, there are more problems which cascade into still more unanticipated new problems.
For now, I'm planning to leave the wing removable but will have to cut into the tail to replace the elevator pushrod because the new one won't be the exact length needed to fit the new 1/8" x 6" flap horn with aligned flaps and elevators.
It doesn't look like props will be a problem but there are still questions about engine rework unanswered.
Altogether, this is going to take months with approximately as much effort as building a complete, but simpler, stunt ship. It took a big act of will to make that first opening in the wing, but, now that its started, work is proceeding well.
Al
I've finally gotten into taking the Hornet apart to begin the rebuild/finishing of the airplane. So far, I've tried to limit the size of the holes cut into the wing structure but everywhere I turn there are more and bigger holes required.
The 3" double Top Flite bellcrank is out and a new laser cut BBQB mount is being made by Kyle to mount the Morris phenolic 4" replacement. Trial fits have been made to determine sizes and clearances.
[photo not recovered: 28216.jpg]
The retract mechanism is all out. I didn't think this would be possible, but it worked out. This photo shows most of the stuff mounted inside the wings and nacelles, not counting the retract control components. All of this is scrap. There will have to be new shock gears made with altogether new mounts. Leaving the gear extended changes the design vertical Center of Gravity so the leadouts will also have to be relocated to the bottom of the wing tips. Everywhere, there are more problems which cascade into still more unanticipated new problems.
For now, I'm planning to leave the wing removable but will have to cut into the tail to replace the elevator pushrod because the new one won't be the exact length needed to fit the new 1/8" x 6" flap horn with aligned flaps and elevators.
It doesn't look like props will be a problem but there are still questions about engine rework unanswered.
Altogether, this is going to take months with approximately as much effort as building a complete, but simpler, stunt ship. It took a big act of will to make that first opening in the wing, but, now that its started, work is proceeding well.
Al
Attachment
#1, (jpg file)
Attachment
#2, (jpg file)